Services / Network Power & Resilience
The network is only as reliable as its power supply.
In Nigeria, most network outages are power outages. We design the power side of every installation as carefully as the data side — sized for real load, with runtime you can trust and monitoring that tells you a site is in trouble before it goes dark.
Load audit — network room, 42-room lodge
Switching + PoE (18 APs)412 W
NVR + 12 cameras168 W
Router, OLT, PBX94 W
Measured load 674 WBattery bank 7.2 kWh LiFePO₄Runtime at load 9 h 20 m
What we do
- Load audits and runtime calculations for network rooms and remote sites
- Solar and lithium battery systems for towers, cabinets and outdoor cabinets
- UPS and DC power for racks and NVRs
- Remote power monitoring — voltage, current, battery state — with alerts
- Retrofits for existing installations that keep going down
Why we’re unusual here
Most network contractors leave power to “the electrician”. Most solar installers have never sized for a rack that must not go off. We do both, on the same job, with one point of accountability.
Tell us where the site is. We’ll tell you what it needs.
Site surveys in Lagos and Anambra are free. Elsewhere in Nigeria, survey cost is credited against the project.